Significant savings can be made on energy and operating costs and in CO 2 output. Box 1, Salford Road Over Hulton, Bolton BL5 1DD United Kingdom Tel: 44.1204.661.230 Fax: 44.1204. #>U Battery chargers restore the electrical energy used during battery operation back to a full state of charge. This change should be done by a qualified electrical contractor. To ensure good continuity keep the contact area clean. See applicable drawing 4770-65-73041-05, 4770-65-73041-15 or 4770-65- 73041-17 for electrical schematic (Appendix B, pages 21-31). UNC hardware provided in all four corners on top cover, markings on the door label and the unit nameplate must be revised, BATTERY WATERING OPERATION AND END OF CHARGE, Upload manuals that we do not have and get. Careful consideration must be taken when connecting this charger, to a generator. The charger will automatically charge a battery per the Ah rating set at the factory. GNB shall not be obligated to reimburse the original user or any other person for any work performed. High Visibility - Charge Status Indicator, Soft-keys (The function of the button will be displayed on the LCD Display), *Watering system (Shown when enabled, flashing during operation), Equalise (Shown when enabled, flashing during operation), Automatic Equalise (Shown when enabled, flashing during operation), Battery Recovery Mode (Shown when enabled, flashing during operation), *Air system enabled (Shown when enabled, flashing during operation), Before connecting the battery, check that the battery voltage, corresponds to the voltage indicated inside the battery, symbol on the LCD Display. endstream endobj 279 0 obj <> endobj 280 0 obj <>/ExtGState<>/Font<>/ProcSet[/PDF/Text/ImageC]/XObject<>>>/Rotate 0/TrimBox[0 0 612 792]/Type/Page>> endobj 281 0 obj <>stream Leading manufacturers of attachments, forks and related technologies for forklifts and AGVs. they are displayed when no battery is connected. "Thanks to our advertising with Forkliftaction, we were able to find new distributors for our disruptive proximity warning solution". Indication Abbreviation Interpretation 1.00 2.00 3.00 4.00 5.00 6.00 8.00 1 hour delay set 2 hour delay set 3 hour delay set 4 hour delay set 5 hour delay set 6 hour delay set 8 hour delay set Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts CHP CHamPion Control board is set to 2.55VPC not 2. Operating environment should not contain any contaminations that may cause corrosion or contamination that would degrade the performance of a charger. hbbd``b`@i&`,? While charging, an equalize charge can be requested by pressing = and turned off by pressing =. CHARGING LED DOES NOT LIGHT ON AFTER BATTERY CONNECTION Possible Cause Action 4.1 Connection between charger and battery open. to endanger life, so insulated, shrouded connectors must be fitted. 7.2.2BATTERY WATERING OPERATION AND END OF CHARGE. The SCRFLX battery charger has an available watering control and end of charge option, in the form of a relay contact at terminals TB10-1 to TB10-2 (supplied for customer connection). SALES - SERVICE - RECYCLING SCR200 SERIES INDUSTRIAL BATTERY CHARGERS 1-888-563-6300 in the USA INSTALLATION & OPERATING INSTRUCTIONS 1-800-268-2698 in Canada SALES - SERVICE - RECYCLING TOLL FREE 1-888-563-6300 in the USA 1-800-268-2698 in Canada V19CIL5200ULS 2006-11 GNB Industrial Power A Division of Exide Technologies Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. For proper connection, torque the screws to approximately 25 inch-pounds. The charger has a comprehensive self-checking diagnostic program to control all charger functions, monitor the quality of charge and check its own safety conditions. All SCRFLX battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. 0 Except as authorized in writing, this warranty does not cover any equipment that has been repaired or modified by any party other than GNB. Maintenance process Typically the generator control bandwidth should be. 3.3 Chargers DC fuse blown. STONE, BRICK, CONCRETE OR METAL. In the "ON" position, AC power is supplied to the charger but the door cannot be opened. 4. 4.4GNB will only bear costs for freight 12 months from the initial date of shipment on any replacement or repair. How to manage the battery in the forklift? All SCRFLX battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. Refer to Appendix A (on page 19) for a complete list of codes. All charger models with a Z, SCR100-XX-XXXT1Z OR SCR100-XX-XXXS1Z, can be stacked to a maximum of three high. SCR100 Charger - Exide Technologies . Operating Instructions and Safety Precautions for the EHF Series Charger, Only a t rained person should operate this equipment. 1.7 Battery Connector and Charging Cable Verify that the connectors on both the battery and the charger are attached so that the positive output terminal of the charger is connected to the positive battery Standby With the input supply connected and no battery, the charger will enter the standby mode. Battery chargers restore the electrical energy used during battery operation back to a full state of charge. Do not touch un-insulated. Incorrect re-assembly of the charger may result in an explosion, electric shock or fire. 2100 HP. If any shipping damage or partial loss is found, file a claim with the carrier without delay and take any necessary steps to protect your rights. Verify AC voltage per nameplate of the charger and electricians tag. NOTE: Only HRCI-R type fuses (ECSR or equivalent) with the notched ferrule at one end can be used. Exide Technologies engineers design several charger models primarily for Motive Power applications using High Frequency (HF) technology to minimize recharge times. Large easy to read LEDs, three button keypad and LED display report on charger and battery status. The charger is warranted for four (4) years from the date of manufacture as determined by the product serial number, with the following exceptions: 3.1Power transformers, SCR's and silicon diodes are warranted for ten (10) years from the date of manufacture of the charger(s) of which they are a part. The input. Subscribe Now to access a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. The equipment has been f actory set and does, This product has been designed, manufactured and certified to be, in conformance with UL Standards. Refer to the Troubleshooting section for more details. Step 2: Check if the transformer has output 7.1 Fault and Display Codes 8. We will report back on the show itself next week, but the most significant news for the European equipment sector has probably been overlooked in the lead-up to the show. Sort messages by: 1. USE COPPER-CLAD ALUMINUM, ALUMINUM OR The BLACK DC cable must be connected to the battery negative (-), and the RED DC cable must be connected to the battery positive (+). Industrial battery chargers dec200 series (20 pages), Scr series chargers with single phase input (68 pages), Scr 100 series industrial battery charger (39 pages), Dedicated fast charger for industrial batteries (19 pages), Manual will be automatically added to "My Manuals", Battery Charger GNB Industrial Battery Charger Installation And Operation Manual, Battery Charger GNB SCR SERIES Installation & Operating Instructions Manual, Battery Charger GNB SCR100-06-260S1Z Installation & Operating Instructions Manual, Battery Charger GNB EHF Series Operating Instructions And Safety Manual, Battery Charger GNB FURY X-3 Installation And Operating Instruction Manual, Battery Charger GNB Tubular LMX Installation And Operating Instructions. %%EOF b) Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. For non Z models contact your local GNB service representative. SHOW MORE . 2. TABLE 3 - THREE PHASE RATINGS 11. Consult GNB technician. PAGE 1. NOTE: Use only identical replacement fuses obtainable from your GNB service representative. e)Only qualified personnel should operate or service this equipment. The DC output fuse is a "fast-acting" fuse used to protect the power semiconductors of a charger. NOTE:These options require different control cards per drawing 4120-65-68650-05 (see Appendix B, pages 2131). All SCR100 battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. For an equalize charge cycle, the current value is displayed as [ xx.xx E). 278 0 obj <> endobj Refer to the Troubleshooting Section (Section 13, page 17) for more details. In no event shall the original user be entitled to recover for contingent expenses resulting from but not limited to, telephone calls, telegrams, travel expenses, lodging, duties and taxes, labor, rental or replacement equipment, loss of business or profits or other commercial losses. Operating Instructions and Safety Precautions for the 2100LP & 2100HP Chargers Safety Careful consideration must be taken when connecting this charger to a generator. The following options are available: Only the AC input wire configuration for multi-input chargers can be changed. LIST OF DISPLAY INDICATIONS, APPENDIX B: ELECTRICAL SCHEMATIC DRAWINGS, SCRFLX SERIES INDUSTRIAL BATTERY CHARGERS, 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS. Before installing, check that the charger nameplate data corresponds to the packing slip and to the model specified on the original sales order. DELAY CIRCUIT CAUTION: HAZARDOUS VOLTAGES INSIDE. Australias Bestrane has secured a contract with British grocery delivery company Ocado, one of the worlds largest online grocers. This website is best viewed in Internet Explorer 10 or above. | About Us PAGE 3. Symptom => Disconnect battery and AC power. Take it to a qualified GNB service center. b)Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. Do not disassemble the charger. D3E2-24-850B Exide Depth Charger showing codes C=04 & E=05 with connected battery and disconnected too.. Contact us for help. Forkliftaction.com accepts no responsibility for forum content and requires forum participants to adhere to the rules. Keep in mind if the charger is set for more than 100% of Ah of the charger rating the charging time will increase proportionately (up to 16 hours). Any claimed defect is subject to GNB's inspection and judgment, after the defective product has been returned by the original user at its expense to GNBs designated point of shipment. Final details will not be available until the legislation is published in the EU Official Journal in July. The charger should be located in a clean, cool, normal ambient room temperature (between +45F/7.2C and 90F/32.2C) dry and well ventilated area. 5.3 AC VOLTAGE CONNECTIONS 6.0 DC OUTPUT To connect the input AC voltage, route the AC conduit through the knockout hole provided. In no event shall the original user be entitled to recover for contingent expenses resulting from but not limited to, telephone calls, telegrams, travel expenses, lodging, duties and taxes, labor, rental or replacement equipment, loss of business or profits or other commercial losses. Charger connected to high AC voltage. Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. 4.2Replacement and exchange parts will be warranted for a period of ninety (90) days. any latin characters (a-z, A-Z) any numbers (0-9) special characters ("-", "_" and "."). 1.2The charger is used under conditions for which it was designed and is not subject to misuse, negligence or accident. Battery chargers come in many shapes and sizes designed to replace the energy consumed with the highest level of efficiency. You can even use it for maintenance charging of most vehicle or leisure batteries. The charger profile is set at the factory for a charger DC cable length of 9ft and a battery DC cable length of 25in. In the "OFF" position, the door can be opened but only AC power at the input of the switch is present while everything downstream is dead. portion of output connector or un-insulated battery terminal. hb```@VB eahIphapb The charger comes with a ground lug attached to the stud, clearly marked on the chassis. During the initial three (3) years of charger warranty period, GNB will bear all parts and labor costs of such repair or replacement. It is a requirement to ground the chassis while the charger is connected to AC power. INSTALLATION & OPERATING INSTRUCTIONS SCR FLX SERIES INDUSTRIAL BATTERY CHARGERS. Before proceeding check which transformer tap configuartion you have. Do not connect the next battery before you see indication OFF/FCA. A Division of Exide Technologies SALES - SERVICE - RECYCLING TOLL FREE . 1-888-563-6300 in the USA . 8.0 CABINET OUTLINE/DIMENSIONS 13. B 20.65 26.65 26.65 42.00 42.00 59.00 DIM. NOTE: The following applies to three phase chargers only: if the charger indicates FAC or F3 upon start-up, it means that there is a low or high AC voltage (+35%) or AC phase missing. Have the charger examined by a GNB service representative or local qualified service facility. Step 1: Check if the mains power supply has electricity and if the battery is under voltage temperature range must be maintained between 32F - 95F. Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. Box 1, Salford Road Over Hulton, Bolton BL5 1DD United Kingdom Tel: 44.1204.661.230 Fax: 44.1204.652.100 GB-3889 RPT 11/01 Printed on recycled paper www.gnb. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. A JIC type switch can only be factory installed and it is available in a B, C or D size cabinet. Kalmar USA, During the last six (6) years of the ten (10) year warranty on power transformers, SCR's and silicon diodes, GNB will bear costs of parts replacement only; no labor or other services will be provided by GNB. | Products The SCR100 chargers are delivered on skids for easy handling using a fork lift truck. United States, Bluestar Global Logistics, %PDF-1.6 % What are the commonly used batteries for AGV cars? - C.F. i)Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. less than 7Hz with good gain and phase margins. France is the most visited country in the world. f)De-energize all AC and DC power connections before servicing this unit. Take it to a qualified GNB service center. The generator should have, load step immunity to prevent undershoot and overshoot with, typical loads. 9.1 JIC . Home Delivery World will be held June 14-15 in Philadelphia, and brings together the worlds most innovative final mile delivery stakeholders and technologies that will revolutionize the eCommerce supply chain. To connect the input AC voltage, route the AC conduit through the knockout hole provided. The SCRFLX chargers are delivered on skids for easy handling using a fork lift truck. The charger is used within the published performance rating for the unit involved. The V Series Li-ion Battery Forklift, with optimized perfomance and reliability, advanced safety features and a powerful and efficient L-ion battery system, is now in worldwide production and shipment. PACIFIC CHLORIDE GNB Industrial Power Motive Power GNB Industrial Power Motive Power Exide Technologies Chloride Motive Power 829 Parkview Boulevard Lombard, IL 60148-3249 U.S.A. Tel: 877.GNB.INFO Fax: 630.691.7869 8301 Keele Street Maple . Examine the charger thoroughly before using, to make sure that no parts have been loosened or damaged during shipment. i)Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. All charger models with a Z, SCRFLX-XX-XXXT1Z of SCRFLX-XX-XXX-S1Z, can be stacked to a maximum of three high.
How Do I Share My Wordle Results?, How To Find Population Mean In Excel, Who Was Anne Francis Married To, Lori Martin Niagara Falls Where Is She Now, When Will Allegiant Release 2022 Flights, Articles E